top of page

KEVIN EMBURY

MATERIAL HANDLING & PIPING 

IMG_0443_edited.jpg

Experience Summary:

 

Kevin has over thirty years of diversified Design/Drafting experience in Mechanical /Structural /Piping /Materials Handling in the Power Generation, Oilsands, and Waste Management industries. Kevin has been involved in the planning and design of a major power generating plant as well as numerous other isolated power generating stations. Kevin enjoys working as a member of an integrated design team to design and develop projects in close consultation with clients.

Contact:

Email:

kembury@dynawesteng.com

Tel:

780-469-5622 Ext. 219

Education:

Engineering Design & Drafting Technology N.A.I.T., 1986

 

Project Experience :

  • ATCO Electric – Garden River Isolated Generating Power Station Upgrade

  • ATCO Electric – Various Isolated Generating Power Stations

  • ATCO Electric – Fort Chipewyan Third Lake Power Plant

  • Suncor –  Upgrading Coker, Safety Clamp System Project

  • Suncor – Extraction Plant 4 HVAC Upgrade Project

  • Suncor – Extraction Plant Centrifuge Installation

  • Suncor – Plant 82 Trommel Screen / Breaker Modifications

  • Suncor – 12000tph Oilsand Ore Preparation/Extraction Facility

  • Suncor – Mackay River SAGD Facility – Safety Shower Piping Upgrade

  • City of Edmonton – Edmonton Waste Management Center – RDF Dryer Waste Heat

  • City of Edmonton – Edmonton Waste Management Center – RDF Truck Loading Facility

  • EPCOR – Goldbar Waste Water Treatment Plant

  • Inland/Lehigh Cement – Fuel Substitution Project

bottom of page