KEVIN EMBURY
MATERIAL HANDLING & PIPING
Experience Summary:
Kevin has over thirty years of diversified Design/Drafting experience in Mechanical /Structural /Piping /Materials Handling in the Power Generation, Oilsands, and Waste Management industries. Kevin has been involved in the planning and design of a major power generating plant as well as numerous other isolated power generating stations. Kevin enjoys working as a member of an integrated design team to design and develop projects in close consultation with clients.
Contact:
Education:
Engineering Design & Drafting Technology N.A.I.T., 1986
Project Experience :
-
ATCO Electric – Garden River Isolated Generating Power Station Upgrade
-
ATCO Electric – Various Isolated Generating Power Stations
-
ATCO Electric – Fort Chipewyan Third Lake Power Plant
-
Suncor – Upgrading Coker, Safety Clamp System Project
-
Suncor – Extraction Plant 4 HVAC Upgrade Project
-
Suncor – Extraction Plant Centrifuge Installation
-
Suncor – Plant 82 Trommel Screen / Breaker Modifications
-
Suncor – 12000tph Oilsand Ore Preparation/Extraction Facility
-
Suncor – Mackay River SAGD Facility – Safety Shower Piping Upgrade
-
City of Edmonton – Edmonton Waste Management Center – RDF Dryer Waste Heat
-
City of Edmonton – Edmonton Waste Management Center – RDF Truck Loading Facility
-
EPCOR – Goldbar Waste Water Treatment Plant
-
Inland/Lehigh Cement – Fuel Substitution Project